Vermont 6

Sooo...  here's more stuff.  Jaimie has been working hard to get his home together.  Electricity is plentiful.... at least enough to watch movies!  Plumbing is operational... even if there is no toilet yet.  Soon, yes, soon!  The shower works great.  I put a hose and a garden hose gun sprayer thing in there (I'll get a picture soon).  Hmmm... the reservoir fills pretty fast when its raining.  I still need to insulate the rain barrels though.  The floors are really great.  Foam rubber... big upgrade from concrete.  Ok, I'm tired.  zzzzzz.......

Ver601.JPG
...just had a shower in the 
rain.  :-)
Ver604.jpg
OK, I haven't worked out in 
a year... I love it.
Ver606.jpg
Tom...
Yep, Tom.
Ver607.jpg
The Stove!
Ver608.jpg
Concrete floor...
Ver609.jpg
More of the floor....
Ver610.jpg
...still the floor....
Ver611.jpg
The Stoooove!
Ver612.jpg
The Stove Pipe!
Ver614.JPG
Beginnings of the shower.
Ver615.JPG
New back wall
Ver616.JPG
Earth duct.
Ver617.JPG
Close up shower...
Ver618.JPG
Leftover concrete.
Ver619.JPG
Shower taking form...
Ver620.JPG
Stuff....
Ver621.JPG
Future sink!
Ver622.JPG
Into the shower...
Ver623.JPG
..and it works!
Ver624.JPG
There it is, done.
Ver625.JPG
mmm, one pan meal.
Ver626.JPG
Stove pipe, final answer!
Ver627.JPG
Me in the shower.
Ver628.JPG
Front wall... too bright!
Ver629.JPG
The other side is viewable.
Ver630.JPG
New foam rubber floor!
Ver631.JPG
...ain't it cool!?
Ver632.JPG
I think so!!!